Case Studies for Software Cost and Schedule Estimation
  • A Case Study and Assessment of a COTS Upgrade for a Satellite Ground System - A case study using the PRICE Systems TRUE-S model's COTS solution to estimate size and cost of an upgrade for a legacy satellite ground system that introduced new distributed client server-based architecture. This upgrade maximized the use of COTS products. This release of the system consisted primarily of the COTS upgrades. A small amount of added functionality included as part of this release.

    This case study is titled "COTS Case Study" in the list of white papers in the URL.

  • Calibrating Software Cost Models to Department of Defense Databases: A Review of Ten Studies - There are many sophisticated models and methods for estimating the size, cost, and schedule of software projects. However, the ability to accurately estimate software cost, size, or schedule is still dubious. In general, the predictive accuracy of models for estimating software development cost and schedule has not been shown to be better than “within 25 percent of actual cost or schedule, about one half of the time”, especially for Department of Defense software efforts. The same is true for software size estimating models and methods, although there are some studies that have shown superior results. For software support (or maintenance) cost estimation, no model has been demonstrated to be accurate. This paper presents a summary of efforts performed to date which demonstrate the accuracy (or lack thereof) of software models. The results of several studies in the areas of software development cost and schedule estimation, size estimation, and support cost estimation are presented to show what these models can and cannot do. Some ideas for improvement are also presented, including the results of some studies which may lead to a resolution of the accuracy conundrum which currently exists...

Suggest Supporting Web Sites
Related pages:
sidebar
sidebar
sidebar

s

s

s

s


SISOS cover
DACS Latest Technical Report


TEMS Logo
Visit the DTIC TEMS Initiative

   DACS Gold Practice Initiative ROI Dashboard
 
Acquisition Process Improvement
Architecture-First Approach
Assess Reuse Risks and Costs
Binary Quality Gates at the Inch-Pebble Level
Capture artifacts in rigorous, model-based notation
Commercial Specifications and Standards/Open Systems
Defect Tracking Against Quality Targets
Develop and Maintain a Life-cycle Business Case
Ensure Interoperability
Formal Inspections
Formal Risk Management
Goal-Question-Metric Approach
Integrated Product and Process Development
Manage Requirements
Metrics-based Scheduling
Model Based Testing
Plan for Technology Insertion
Requirements Trade-Off/Negotiation
Statistical Process Control
Track Earned Value
  Access benefit data from software technical and management improvements including SEI CMMI, PSP/TSP, Cleanroom, Inspections, and Agile Development.

View the ROI Dashboard
Copyright © 2010, ITT Corporation    Privacy Policy
webmaster@thedacs.com
775 Daedalian Drive Rome, NY 13441
(800) 214-7921 Fax: 315-838-7130
This site is best viewed in Firefox 1.0+ or IE 6.0+
XHTML